HDD and Directional Boring Project RFQ Form: Fields That Matter
Build an HDD project RFQ around location, utility, footage, carrier/conduit, bid deadline, plans and access without turning the website into bore-planning or estimating software.
Overview
A directional-drilling form should help the estimator understand the job before the first call.
It should not ask the buyer to design the bore.
Field 1: Company and project contact
Collect:
- company;
- estimator/project manager;
- email;
- phone.
Field 2: Project name and owner
Useful for bid tracking and public/private procurement.
Field 3: Project location
Collect:
- city/state/region;
- job address;
- corridor/intersection when appropriate.
Field 4: Project type
Options can include:
- telecom/fiber;
- electric;
- gas;
- water;
- sewer/force main;
- irrigation;
- casing;
- other utility;
- not sure.
Field 5: Crossing type
Useful choices:
- roadway;
- railroad;
- river/waterway;
- parking/industrial site;
- congested utility corridor;
- open field;
- other.
Field 6: Approximate bore footage
Allow Not sure.
Do not force a field estimate to become a design value.
Field 7: Carrier / conduit size and material
Optional fields can include:
- conduit/pipe size;
- material;
- casing requirement if known.
Field 8: Bid due date
One of the highest-value commercial fields for HDD contractors.
Ask:
When is your bid or quote due?
Field 9: Requested start / construction window
Use:
Anticipated construction date
rather than a confirmed crew schedule.
Field 10: Plans / specifications
Ask whether the buyer has:
Use the approved document-transfer process.
- civil plans;
- utility plans;
- bore profile;
- specifications;
- bid package;
- no files yet.
Field 11: Geotechnical / boring information
Ask whether boring logs or soil information exist.
The form should not interpret them.
Field 12: Grade / line criticality
Optional high-level context:
Let technical review determine final constraints.
- grade critical;
- target/manhole tie-in;
- gravity line;
- unknown.
Field 13: Site access
Ask whether the pit/rig area is:
- open;
- tight;
- urban;
- limited vehicle access;
- unknown.
Field 14: Existing utilities / overhead constraints
Ask for known conditions only.
Do not use the public form as a locate record.
Field 15: Wage / project requirements
Where relevant to the contractor:
- prevailing wage;
- union;
- public works;
- certified payroll;
- not sure.
Field 16: Notes
Prompt:
Describe the utility, crossing, approximate length, project schedule and any known site constraints.
What not to ask the buyer to decide
Do not make the public form determine:
Those belong to qualified estimating, engineering and field processes.
- final bore path;
- entry/exit angle;
- minimum bend radius;
- drilling forces;
- utility clearances;
- drilling-fluid design;
- rig/tool selection;
- permit applicability;
- locate status.
Should the form accept plans?
Yes, when the contractor has an approved technical document workflow.
Otherwise ask whether plans exist and collect them after first review.
Should the RFQ create a field job automatically?
No.
Use:
RFQ → estimating review → proposal/award → field project
A bid that is never awarded should not create field capacity or compliance records.
Confirmation message
Use:
Thanks. We received your HDD project request. Our team will review the location, utility/crossing scope, footage, bid timing and available plans and contact you about the next step.
Avoid:
Your bore is scheduled.
until estimating and operations have accepted the project.
Collect the bid context before the bore plan begins
A useful RFQ helps estimating move faster without pretending the technical job has already been designed.
Explore OneStudio features, compare plans, or review the turnkey website service.
Questions businesses ask
What should an HDD quote form ask?
Ask for project location, utility/crossing type, approximate footage, carrier/conduit details, bid deadline, anticipated start and available plans.
Should customers calculate the bore path?
No. The public form should collect scope, not engineering.
Should utility-locate information live in the website CRM?
No. Keep verified locate and field records in the specialist operational system.
Does OneStudio plan HDD bores?
No. OneStudio should be positioned around the public website, RFQ and ordinary client workflow. Bore planning belongs in specialist HDD tools.