← OneStudio Guides

Websites

Laboratory Casework and Fume Hood RFQ Form: Fields That Matter

Build a laboratory furniture RFQ around project type, casework, fume hoods, floor plans, specifications, installation and schedule without turning the website into design software.

Overview

A laboratory furniture RFQ should help the project team answer:

Current lab-furniture companies already use this structure.

PSA Laboratory Furniture currently asks customers to:

That is a strong commercial pattern.

  • What kind of lab is being built or renovated?
  • Which furniture and hood categories are involved?
  • Are plans or specifications available?
  • Does the customer need design support?
  • Is installation part of the scope?
  • What schedule drives the project?
  1. select laboratory furniture;
  2. upload artwork or a plan;
  3. provide the project timeline;
  4. provide contact information.

Field 1: Organization and requester

Collect:

Useful roles can include:

  • organization;
  • contact;
  • role;
  • email;
  • phone.
  • facilities;
  • lab manager;
  • architect;
  • lab planner;
  • GC;
  • procurement;
  • project manager;
  • research/operations.

Field 2: Project name and location

Collect:

Location affects:

  • project name;
  • city/state/region;
  • site address when appropriate.
  • delivery;
  • installation;
  • service territory;
  • project coordination.

Field 3: Laboratory type / industry

Useful options can include:

  • research;
  • education;
  • pharmaceutical/biotech;
  • healthcare;
  • food/beverage;
  • industrial/QC;
  • environmental/water;
  • government;
  • other.

Field 4: New construction or renovation

Options:

  • new laboratory;
  • renovation;
  • expansion;
  • phased replacement;
  • single-product replacement;
  • not sure.

Field 5: Project stage

Useful choices:

This helps the supplier understand what level of proposal is realistic.

  • early planning;
  • schematic/design;
  • construction documents;
  • bidding;
  • awarded/under construction;
  • replacement/service request.

Field 6: Products needed

PSA currently branches around casework, fume hoods, services and flexible systems.

A provider can use its actual product categories:

  • casework;
  • fume hoods;
  • benches/tables;
  • work surfaces;
  • sinks/fixtures;
  • shelving;
  • flexible/modular systems;
  • accessories;
  • multiple categories;
  • not sure.

Field 7: Approximate quantity

Allow:

Do not force a buyer to convert a plan into a fake item count.

  • room/lab count;
  • cabinet run length;
  • hood count;
  • bench/table count;
  • furniture schedule;
  • not sure.

Field 8: Floor plan or sketch

Ask:

This is often more useful than paragraphs of description.

  • plan attached;
  • room sketch attached;
  • plan forthcoming;
  • no plan yet.

Field 9: Specifications / RFP

Allow:

  • project specification;
  • bid package;
  • furniture schedule;
  • RFP;
  • scope document;
  • none yet.

Field 10: Design support

Options:

Do not imply the supplier provides licensed engineering unless it actually does.

  • design complete;
  • design by architect/lab planner;
  • layout support requested;
  • product selection support requested;
  • not sure.

Field 11: Casework preference

Where relevant:

Only show materials the business actually supplies.

  • steel;
  • wood;
  • modular/flexible;
  • provider recommendation;
  • specified product line;
  • not sure.

Field 12: Work-surface preference

Where supported:

The project team should verify compatibility with the actual lab use.

  • epoxy;
  • phenolic;
  • stainless;
  • other actual material;
  • specified;
  • not sure.

Field 13: Fume hood context

If fume hoods are selected, ask at a high level:

Do not use the web form to size exhaust or certify containment.

  • quantity;
  • type specified;
  • size if known;
  • project spec attached;
  • replacement vs new;
  • provider recommendation.

Field 14: Utilities / MEP coordination

At a high level:

The form should collect coordination context, not design the utilities.

  • water;
  • gas;
  • power/data;
  • vacuum/compressed air;
  • exhaust/BAS coordination;
  • by others;
  • not sure.

Field 15: Installation

Ask:

  • supply only;
  • installation required;
  • installation by GC/other;
  • not sure.

Field 16: Delivery / site access

Useful context:

  • loading dock;
  • freight elevator;
  • limited access;
  • active/occupied facility;
  • phased delivery;
  • construction site;
  • not sure.

Field 17: Desired delivery date

Separate product delivery from installation.

Field 18: Desired installation / occupancy date

Collect:

  • install target;
  • lab opening/occupancy;
  • phased dates;
  • flexible.

Field 19: Budget context

Optional:

  • budget established;
  • budget range;
  • bid/RFP;
  • need budget guidance;
  • not sure.

Field 20: Notes

Prompt:

Describe the laboratory project, products needed, plans/specifications available, installation scope and the schedule the project team should review.

What the form should not decide

Do not automatically calculate:

Those belong to qualified project workflows.

  • final layout;
  • fume hood airflow;
  • exhaust sizing;
  • utility design;
  • code compliance;
  • product certification;
  • final BOM;
  • fabrication sequence;
  • installation crew schedule.

Single product vs full project

Single product

Keep the path short:

  • product;
  • quantity;
  • size/spec if known;
  • location;
  • timing.

Full laboratory project

Add:

  • plans;
  • specifications;
  • project stage;
  • design support;
  • installation;
  • delivery/occupancy dates.

Confirmation message

Use:

Thanks. We received your laboratory project request. Our team will review the product scope, plans/specifications, installation needs and project timeline and contact you about the next step.

Avoid:

Your lab design is approved.

or:

Your fume hood is certified.

Collect enough to start a project review without pretending the laboratory has already been designed

A strong RFQ lets the specialist see the project shape quickly and ask smarter follow-up questions.

Explore OneStudio features, compare plans, or review the turnkey website service.

Questions businesses ask

Should a plan upload be required?

No. It is highly useful, but early-stage projects may not have one yet.

Should the buyer choose an exact fume hood model?

No. Allow a specification or not sure / specialist review path.

Should the RFQ ask for utilities?

Only at a high level for coordination. Detailed MEP design belongs to qualified project professionals.

Does OneStudio design laboratory layouts?

No. OneStudio should remain the public website, enquiry and ordinary CRM layer.